The Kitchen Continues!!
This is the desk area under the window. Very nice for bill paying!
This is the cold center. We have a beverage cooler and wine cooler flanking the 48" fridge. Everything should be handy when you are ready for a cold one!!
The cook top, double ovens and warming drawer will be on the right. Sink and dishwasher will be on the left.
This is the cold center. We have a beverage cooler and wine cooler flanking the 48" fridge. Everything should be handy when you are ready for a cold one!!
The cook top, double ovens and warming drawer will be on the right. Sink and dishwasher will be on the left.
Wednesday, September 1, 2010
Cabinet Installation
This is a typical shot of a Four Walls Design and Construction, Inc. kitchen cabinet installation. What you don't see is the new soffit construction, and how the cabinet locations are marked on the floors ans walls.
Notice how clean the work site is. All the appliances are on site, the rough electric, framing and plumbing has all been done and passed inspection. If you move any electric, plumbing or hvac you must get a permit from your municipality! This protects you the consumer from unscrupulous contractors. This also makes sure the contractor is doing their job correctly!